Project overview

Dream Energy Pvt. Ltd. awarded Civil Solution Engineering the consulting contract for Gaja Khola HPP, a 5.36 MW run-of-river hydropower project in Rolpa District.

The project has secured its connection agreement and is waiting for a power purchase agreement (PPA).

At a glance

Project
Gaja Khola HPP
Capacity
5.36 MW
Location
Rolpa District, Nepal
Client
Dream Energy Pvt. Ltd.
Type
Run-of-river hydropower
Services
Feasibility Study · Hydrology & Sediment
Assignment status
Feasibility Study: Completed
Hydrology & Sediment: Completed
Project status
Waiting for PPA

Feasibility Study

Assignment completed

  • Review of previous studies
  • Hydrology and sediment studies
  • Geology and geotechnical studies
  • Project alternative and optimization studies
  • Project layout and design (civil, hydromechanical and electromechanical)
  • Rate analysis, quantity estimates and cost estimates
  • Construction planning and scheduling
  • Financial analysis and project evaluation

Civil Solution Engineering completed the whole assignment within the specified time under the contract.

About our feasibility study service

Hydrology & Sediment Field Investigations

Assignment completed

  • 6 direct river discharge measurements
  • Gauge installation and recording
  • Preparation of rating curves
  • Daily sediment sampling using the bucket sampling method for 30 days
  • Sediment laboratory analysis: concentration, particle size distribution, organic matter and mineral contents

Civil Solution Engineering completed the whole assignment.